韩国精品欧美一区二区三区-韩国精品福利一区二区-韩国黄网-韩国黄色一级毛片-韩国黄色网页-韩国黄色毛片

咨詢熱線:021-80392549
當前位置: 首頁 > 資料下載 > 工業控制 > PLC

施耐德-Medium power busbar trunking Canalis KS(100 to 800A) Catalogue

PDF文檔
  • 文件類型:PDF文檔
  • 文件大小:2.53M
  • 更新日期:2016-02-26 15:54
  • 瀏覽次數:408   下載次數:430
進入下載 PDF預覽
詳細介紹
 施耐德-Medium power busbar trunking Canalis KS(100 to 800A) Catalogue
Components for changing direction
1、Edgewise elbow.
One model for each size of
casing for turning to left or right.
2、Flatwise tee
Two models for each size of
casing (one ascending, one
descending).
3、Edgewise tee
For vertical branches on the
main run.
二、Fixing devices
1、Universal brackets
These brackets are used to fix the distribution
run to the structure of the building, directly or via
a threaded rod, a bracket, etc.
There is one model for each size of casing which
can be used for all mounting methods : ceiling
mounted, suspended, wall mounted, etc.
Suspension on chains or steel cables is not rec-
ommended.
It is advisable to leave a space of 3 m between
each bracket.
2、Spring brackets
These brackets are fixed on floor ground to sup-
port distribution run in vertical application, used
in rising building such as rising apartment, com-
mercial skyscraper, etc. For all ratings from 100
to 800A, there’s only one model and must be
used in couple.
The spring brackets can absorb the vertical
construction expansion and adjust the busbar
situation, so as to distributing equally and
averagely on all floors.
 
[ 資料下載搜索 ]  [ 加入收藏 ]  [ 告訴好友 ]  [ 打印本文 ]  [ 關閉窗口 ]

下載地址
 
推薦資料下載
本類下載排行
總下載排行
 
首頁 | 店鋪 | 產品中心 | 工博士培訓 | 資料下載 | 方案案例 | 機器人選型 | 會員注冊 | 關于我們 | 聲明 | 合作客戶 | 聯系方式 | 網站留言| 網站地圖

咨詢電話

021-80392549

企業微信

主站蜘蛛池模板: | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |